A set of works on construction and commissioning of a ground solar power plant with a capacity of 3.429 MW with the connection to 10 kV power networks of the "Lvivoblenergo" PJSC was performed.
The power plant is located in the Village of Kulykiv of Zhovkva District of Lviv Region.
A 10 kV cell was reconstructed at the 35/10 kV Kulykiv substation, a 3.5 km long 10 kV cable line was built, including 0.8 km of insulated wire, and 3 package 10/0.4 kV transformer substations were assembled for the purpose of delivering the power plant's power to the general network.
The generating equipment consists of 45 pc 60kW inverters manufactured by Kehua Tech, 6,546 pc 375W solar panels and 2,634 pc 370W solar panels manufactured by Trina Solar.
The sale of electricity at the feed-in tariff began on October 2, 2020.