A set of works on the external power supply of the oil press facility with a capacity of 2 MW and connection to the networks of the State Territorial Sectoral Association "Lviv Railways" in the Village of Stavchany of Pustomyty District of Lviv Region.
To ensure reliable power supply, the following equipment was installed:
Construction of a new 35 kV cell at the "Sknyliv" traction substation with the installation of a VB4-P-35-25/630 U1 vacuum circuit breaker, RDZ-2-35/1000 bus and line disconnectors manufactured by "AVM Amper" OJSC, 35 kV CTSO 38 current transformers.