Rivne Nuclear Power Plant ME SE NAEK ENERGOATOM

A set of construction and installation works on the modernization of the excitation system of the turbine generator No. 4 at the generating unit No. 2 of the separate division "Rivne Nuclear Power Plant" with the installation of the following equipment:

  • excitation cubicle and automation panels,
  • arc suppression resistors,
  • three industrial air conditioning units KA1-25,
  • control and power cables with a total length of 7,000 m,
  • including a 20 kV cable line made of PvEVng 1x500 cable.