State Territorial Sectoral Association Lviv Railways

A set of construction and installation works on the construction of 110 kV overhead cable line from the 110 kV outdoor switchgear at the 330 kV "Kovel" substation to the gantry tower of the 110 kV "Kovel" traction substation of the State Territorial Sectoral Association "Lviv Railways" with a total length of 2,600 m and the performance of the following works:

  • installation of cable section of a power line with the use of APvEgaP-110-1x185 cross-linked polyethylene cable in PE 100 SDR17 pressure thick-walled pipes, 315 mm in diameter, laid using the horizontal directional drilling process, with a total length of 950 m, and installation of two U110-2 anchor supports,
  • 110kV transition joints with the construction of two wells and sealing of cable entries and terminals made of SDR pipe using "Roxtec" cable sleeves